Asbestos in schools — the role of reassurance air monitoring

13th September 2017

By Charles Pickles, Chief technical officer, Lucion Services*

It has long been recognised that the disturbance of asbestos containing materials (ACMs) in older schools and education buildings can lead to harmful fibres being released, with dangerous health risks to pupils and teachers.

Government policy considers that asbestos that remains in good condition and is unlikely to be damaged or disturbed is not a significant risk to health as long as it is properly managed. Only when ACMs are disturbed or damaged is the risk of exposure increased through the release of airborne fibres.

For those duty holders with responsibility for maintaining health and safety and building maintenance standards in schools where asbestos is known to be present, the crucial question is therefore how it can be dealt with safely?

The most common way that ACMs might be disturbed is during maintenance, repair or building works. In addition, in schools, some classroom activities such as attaching pupils work to walls or the movement of furniture, as well as vandalism, accidental damage or boisterous behaviour have all been mentioned as potentially causing damage to building materials and so increasing the health risks associated with the release of fibres.

The hazard is the presence of asbestos, but the risk to the occupants is when the asbestos fibres become airborne and can be inhaled. An asbestos survey identifies the hazard, but on its own rarely measures risk to an effective level; the key requirement is to target resources by properly assessing the risk present and controlling them effectively.

To completely eradicate the risk posed by deterioration of ACMs there have been calls for the complete removal of asbestos from all school buildings.

Of course, whilst it is essential that everyone continues to recognise the risks to health associated with asbestos fibres, full consideration needs to be given to the practicalities and scale of work that would be required to meet these ambitions.
For example, the design of many older education buildings means that the only way to completely remove any asbestos present would be to almost completely dismantle parts of them or demolish the entire building.

Against this sort of measure, there are no projections on what the cost of this work would be to the UK economy or how any removal costs would compare to the costs of alternative forms of management and reassurance monitoring that are now available to duty holders.

As a result, although setting out a long term strategy for the removal of asbestos from schools remains a legitimate objective, financial considerations and pressure on resources means it is clearly not feasible to remove all asbestos from schools in the short term.

Currently, asbestos air testing in schools is only routinely carried out following asbestos repairs or removal works. However, modern air monitoring and analytical techniques using scanning electron microscopy (SEM) provide the means to accurately and regularly measure any risks to occupants and enable the appropriate remedial actions to be taken.

SEM enables asbestos in air to be quantified to very low levels, typically achieving lower limits of detection to 0.0005 fibres/ cm 3 and below, compared to the 0.01 fibres/cm 3 capability of standard phase contrast microscopy (PCM). SEM can also distinguish between different asbestos fibre types and other non-organic fibres.

SEM’s ability to more accurately determine whether asbestos fibres are present means it can better identify the level of any risk that might be present — and what remedial actions are required.

Used in this way, reassurance air monitoring using SEM analysis can enable actual and direct asbestos risk measurements to be made in specific school locations. This is turn can be used to prioritise risk and target spending on abatement accordingly by avoiding areas that do not present a risk to the health of occupants.

This means that scarce maintenance resources can be properly allocated for the treatment and removal of the most dangerous ACMs in schools, with the continued management of any remaining asbestos until a phased programme of asbestos removal can be initiated.

 

Related Articles

View all articles ›
Construction Risk Alert: What Can You Do To Protect Your Team From Increased Accidents This Week?

Construction Risk Alert: What Can You Do To Protect Your Team From Increased Accidents This Week?

25th October 2019

Construction Risk Alert: What Can You Do To Protect Your Team From Increased Accidents This Week?

Lucion Services Among Fastest Growing 50 Companies In North East 2019

Lucion Services Among Fastest Growing 50 Companies In North East 2019

11th October 2019

The UK market-leaders in asbestos inspection, testing, and consultancy, risk management experts, Lucion Services, named 4th fastest growing medium-sized company in the North East. 

Open Knowledge: Asbestos Identification, Management & Removal

Open Knowledge: Asbestos Identification, Management & Removal

30th September 2019

Members of our Lucion Services management team delivered essential information on asbestos management and control measures during a series of seminars hosted by the Royal Institute of Chartered Surveyors (RICS) throughout the UK.

Healthcare Estates Conference 2019: The Essential Conference For The Health Care Sector

Healthcare Estates Conference 2019: The Essential Conference For The Health Care Sector

21st September 2019

Our health and safety, risk management and environmental consultants are on hand to answer your key CDM Compliance and construction health and safety questions at this year’s Healthcare Estates Conference and Exhibition.