What To Look Out For During Your Asbestos Removal Project

25th March 2020

As the Duty Holder, managing your asbestos removal project can be a daunting task. So we’ve put together some top tips for managing the end to end process.

What types of asbestos removal are there?

Before commencing any asbestos removal works, you must first assess whether the work is licensable, non-licensable or notifiable non-licensable

Licensable Work

Licensable work with asbestos is higher-risk and can only be conducted by a licensed contractor. Such works include;

  • Loose insulation, lagging, sprayed coatings 
  • Loose dust & debris (gross contamination)
  • Significant work with insulating board

All licensable works must:

  • ONLY be carried out by HSE licensed contractor
  • Provide 14 day notification period to the HSE 
  • And additional requirements

Projects involving less risk (such as sporadic, low intensity and less risk of exposure) may not require a licensed contractor. Your contractor will need the below to perform the works:

Non-Licensable

  • Insurance
  • Plan of Work
  • Risk Assessments
  • NNLW Training
  • Specific NNLW  training for Grounds workers

Notifiable Non-licensable works

  • Insurance
  • Plan of Work
  • Risk Assessments
  • NNLW training
  • Notification (instant)
    • ASB NNLW1 form

Please note that asbestos awareness training does not mean your contractor is safe to work with asbestos.

What do I need to consider during my asbestos removal project?

Below are  10 things to consider when managing your asbestos removal project covering your asbestos survey type through to clearance.

  1. Asbestos Survey type – The basic tool for the removal process
  2. Contractual agreement & technical specification – define agreed KPIs
  3. Method statements & risk assessments 
  4. Licenses & proof of insurance 
  5. Analyst/contractor site logs  – what system will you use to monitor activities?
  6. ‘Live’ asbestos updated register 
  7. Waste transfer notes – you can still be liable for asbestos-containing materials after it leaves your site, ensure you know where your waste is going
  8. Chain of communications – communication is king! Setting up the correct lines of communication with your team and contractors can help you save time and money, and acts as a record should things go wrong. 
  9. Air Testing and Monitoring
  10. 4 Stage Clearance Certificate

How long does asbestos removal take?

Asbestos removal is a lengthy process and should be planned for during any refurbishment or demolition project. Failure to plan for asbestos removal prior to the commencement of works can leave your project running behind schedule and at a higher cost.

Download our free Lucion asbestos timeline PDF for information about how we would manage your asbestos removal project: Asbestos Removal Timeline

Need help managing your asbestos removal project?

Our asbestos consultants can help you to factor in asbestos management into your project, helping you to manage the process both efficiently and on budget. Our team also provide a project-specific asbestos removal tender specification as part of our asbestos abatement project management service.

Ensure your project is compliant, on time and on budget by speaking to one of our asbestos consultants today: Contact Us

Related Articles

View all articles ›
Asbestos Re-Inspection Surveys: Top Ten FAQs

Asbestos Re-Inspection Surveys: Top Ten FAQs

3rd April 2020

Here are our Top Ten FAQs from our clients relating to Asbestos Re-Inspection Surveys

Still Delivering Trusted Services

Still Delivering Trusted Services

2nd April 2020

Lucion Services and its subsidiary companies have taken action to ensure we continue to deliver trusted risk management services to keep your projects moving during the COVID-19 outbreak.

Continuing To Deliver Sustainable Services Through Sustainable Practices: Our Gold Standard

Continuing To Deliver Sustainable Services Through Sustainable Practices: Our Gold Standard

30th March 2020

Prestigious UK membership organisation, The Royal Society for the Prevention of Accidents (RoSPA) has once again awarded Lucion Services Gold for both Fleet and Health and Safety performance 2020.

You’ve planned for asbestos works during your modernisation project, but have you planned for air testing and monitoring?

You’ve planned for asbestos works during your modernisation project, but have you planned for air testing and monitoring?

25th March 2020

Asbestos Air monitoring and testing is a fundamental stage of the four-stage clearance. But what type of air testing should you be using?